ANALISIS KESELAMATAN PADA RANCANGANINSTALASI INSINERATOR LIMBAH PROPELAN
Main Article Content
Abstract
Work safety on a job is very necessary, as well as in the propellant waste treatment plant. The Incinerator functions as a propellant waste treatment and interconnected with other supporting facilities such as cutting tools, conveyors and also propellant waste material. So that the layout in the incinerator facility does not cause a potential accident, it is necessary to carried out a safety analysis on the layout design of the facility. The purpose of the research was safety aspects of the incinerator installation. In the aspect of safety analysis, the dominant hazard was identified in the cutting process which can cause an accident to cut hands and be electrocuted. The layout of the installation proposed by considering the safety aspect, it was found that the required space requirement was 15mx20m. initial planning, hazards or accidents can be prevented or reduced.
Article Details
References
Anonim.1969. “PropellantManufacture, Hazardand Testing. American Society. Washington DC”.
Arif, M. 2014. “Analisis Potensi Bhaya Dengan Menggunakan Metode JobSafetyAnalysis (JSA) Pada Proses Coal Chain di Pertambangan Batubara PT. Mifa Bersaudara”. Jurnal USU
Arya, Putu et al. 2021. “AnalisisPotensiBahaya Dan PengendalianRisikoKecelakaanKerjaPadaBagianProduksi Di PT Indonesia Power GratiPomu”. JurnalValtech (JurnalMahasiswa Teknik Industri), Vol. 4 No. 2
Asy’ari, Subchan.2019. PengukuranAntropometriPekerja Cut Open Pada Proses PengolahanSusu di PT. XYZ. Journal Knowledge Industrial Engineering, E-ISSN: 2541-4461.
Bawang, Jeferson., Paul A.T. Kawatu, Ribka Wowor.2018. “Analisis Potensi Bahaya Dengan MenggunakanMetode JobSafetyAnalysis Di Bagian Pengapalan Site PakalPt.Aneka Tambang Tbk. UBPN Maluku Utara”. Jurnal Kesmas, Vol.7 No.5
Budiarto, Tedy Agung Cahyadi.2011. “Peranan Keselamatan dan Kesehatan Kerja (K3) Dalam Kegiatan Peledakan Mineral dan Batubara”. Industrial Engineering Conference 2011
Chandra, B.2005. “Pengantar Kesehatan Lingkungan”. In Buku Kedokteran EGC.
Fitriana, L. dan Wahyuningsih, A.S. 2017. “Penerapan Sistem Manajemen Kesehatan DanKeselamatan Kerja (SMK3) Di PT. Ahmadaris. HIGEIA”. 1(1):30-35
Herwandi, Gusti Muhammad dkk. 2020. “IdentifikasiPotensiBahaya K3 Dan PengendalianRisikoTerhadapPekerjaanPadaKegiatanPembongkaran (Pengeboran Dan Peledakan) Di Pt. SulencoWibawa Perkasa DesaPeniraman, Kecamatan Sungai Pinyuh, KabupatenMempawah, Provinsi Kalimantan Barat”. JeLAST, Vol 7
Ketenagakerjaan, B. 2019.“Angka Kecelakaan Kerja Cenderung Meningkat, BPJS Ketenagakerjaan Bayar Santunan Rp 1,2 Triliun. Dipetik Oktober 20, 2019, dari BPJSKetenagakerjaan: bpjsketenagakerjaan.go.id/berita/2332 2/angka
Manitik, Q. A. 2017. “Analisis Potensi Bahaya Dengan Menggunakan Metode JobSafetyAnalysis di Stasiun Pengisisan danPengangkutan Bulk Elpiji (SPPBE) PT.TambangYokodeltaMatungkas Minahasa Utara”. Jurnal online. Volume 2, No. 6.
Melinda, SefriliaSyumber, et al. 2021. “AnalisisManajemenRisikoKeselamatanKerjaPadaKegiatanPengirimanBahanPeledak Pt XYZ. (StudiKasusMenaikkan Truck Explosive KeLct)”. JurnalIlmiahManajemendanBisnis, P-ISSN 2620-9551
OSHA. 2002. “JobHazardAnalysis. U.S. Department ofLabor. Retrievedfrom: https://www.osha.gov/Publications/osha3071.pdf. Access on: Sabtu, 13 November 2021, 21.27 WIB.
Release, P. 2018. “Menuju Budaya Pencegahan Keselamatan dan Kesehatan Kerja yang Lebih Kuat di Indonesia”. Dipetik November 25, 2019, dari International Labour Organization:ilo.org/jakarta/info/public/pr/WCMS_ 616368/lang--en/index.htm
Faridah, Ran., Rois Fatoni, Ichsan Suryo Wicaksono. 2017. “Analisis Aspek K3 Serta Perancangan Ulang Tata Letak Industri tahu di Kabupaten Pacitan”. The 5th URECOL PROCEEDING, ISBN 978-979-3812-42-7
Tarwaka, & Bakri, S. H. A. 2016. “Ergonomi untuk Keselamatan, Kesehatan Kerja dan Produktivitas”.
Pratiwi, Indah, Etika Muslimah, dan Abdul Wahab Aqli. 2011. “Perancangan Tata Letak Fasilitas di Industri Tahu Menggunakan Blocplan”. Jurnal Ilmiah Teknik Industri. Vol 11. No.2. Hal 102- 112
Ramli, Soehatman. 2010. “Sistem Manajemen Keselamatan dan Kesehatan Kerja OHSAS 18001”. Jakarta:Dian Rakyat
Sanders, M., S., dan McCormick, Ernest, J., 1993. “Human Factors in Engineering andDesign”, Penerbit McGraw-Hill, Inc, New York.
Sulaksmono, M.1997. “Manajemen Keselamatan Kerja”. Penerbit Pustaka. Surabaya.Surakarta:UNIBAPRESS
Waruwu, M.M etal. 2013. “Analisis Keselamatan pada Instalasi Sistem Pembuatan dan Pengujian Solid Propelan Double Base dari Minyak Jarak – Jurusan Teknik Fisika”. TEKNOFISIKA, Vol.2 No.1 Edisi Januari 2013, ISSN 2089-7154
Zhenyuan, Jia, LU Xiaohong, Wang Wei, Jia Defeng, Wang Lijun. 2011. “Design andImplementationof Lean FacilityLayout System of a Produsction Line”. International Journalof Industrial Engineering. Vol 18 (5). Hal 260-269